Mostrar el registro sencillo del ítem
REDISEÑO DEL PUENTE SOBRE EL RIO CAJARITO, ENTRE EL AMPARO COJEDESSANTA CRUZ PORTUGUESA
dc.contributor.author | Gutiérrez, Carlos | |
dc.contributor.author | González, Julio | |
dc.contributor.author | Velasquez, Elio | |
dc.date.accessioned | 2019-11-21T15:17:24Z | |
dc.date.available | 2019-11-21T15:17:24Z | |
dc.date.issued | 2019-10-16 | |
dc.identifier.govdoc | BA2019000019 | |
dc.identifier.issn | 2665-0053 | |
dc.identifier.uri | http://bdigital2.ula.ve:8080/xmlui/654321/3617 | |
dc.description.abstract | Este proyecto se trata de una propuesta para el diseño del puente sobre el rio cajarito ubicado entre los sectores El Amparo estado Cojedes y Santa Cruz estado Portuguesa. Esta propuesta está justificada por el colapso total de la estructura, es por ello que en este ejemplar se diseñan todos los elementos del puente, en base a los criterios de diseños establecidos en las normativas existentes en nuestra nación. La propuesta se enmarca bajo la modalidad de una investigación de campo no experimental, bajo la modalidad de proyecto factible, el instrumento utilizado fue la observación estructurada que arrojo la información necesaria para el diagnóstico y análisis del mismo. Además estableciendo un plan de mantenimiento preventivo para ser ejecutado en la estructura de manera que esta pueda permanecer en el tiempo. | en_US |
dc.description.abstract | This project is a proposal for design of bridge on the river cajarito, located between amparo state Cojedes- Santa Cruz state Portuguesa. This proposal is justified by the total collapse of the structure, that is why in this issue are designed all elements of the bridge, based on the design criteria established in existing regulations in our nation. The proposal is made in the form of a field investigation no experimental, under the modality of feasible project, the instrument used was structured observation. That showed the information needed for diagnosis and analysis thereof. Besides establishing a preventive maintenance plan to be executed in the structure that so it can remain on time. | en_US |
dc.language.iso | es | en_US |
dc.publisher | Universidad Nacional Experimental de los Llanos Occidentales “Ezequiel Zamora”. | en_US |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/3.0/ve/ | en_US |
dc.subject | puente | en_US |
dc.subject | estructura | en_US |
dc.subject | mantenimiento | en_US |
dc.subject | bridge | en_US |
dc.subject | structure | en_US |
dc.subject | maintenance | en_US |
dc.title | REDISEÑO DEL PUENTE SOBRE EL RIO CAJARITO, ENTRE EL AMPARO COJEDESSANTA CRUZ PORTUGUESA | en_US |
dc.title.alternative | Bridge Design on the Cajarito River, between Amparo Cojedes- Santa Cruz Portuguesa | en_US |
dc.type | Article | en_US |