Mostrar el registro sencillo del ítem
Diseño, construcción y evaluación del desempeño de un reactor de carga secuencial para tratamiento de aguas residuales de tenerias
dc.contributor.author | Freytez, Estefania | |
dc.contributor.author | Márquez, Adriana | |
dc.contributor.author | Pire, María Carolina | |
dc.contributor.author | Guevara, Edilberto | |
dc.contributor.author | Pérez, Sergio | |
dc.date.accessioned | 2020-01-15T12:49:49Z | |
dc.date.available | 2020-01-15T12:49:49Z | |
dc.date.issued | 2018-12-14 | |
dc.identifier.govdoc | pp 92.0200 | |
dc.identifier.issn | 2610-8240 | |
dc.identifier.issn | 1316-6832 | |
dc.identifier.uri | http://bdigital2.ula.ve:8080/xmlui/654321/4012 | |
dc.description.abstract | En este artículo se presenta el diseño, construcción y evaluación del desempeño de un reactor de carga secuencial (SBR, en inglés) para tratamiento de aguas residuales de tenerías. La fase experimental del SBR operado con biomasa granular y con biomasa suspendida se ejecutó en las siguientes etapas: 1) construcción del SBR, 2) selección del sustrato, 3) aclimatación de la biomasa , 4) diseño experimental, 5) evaluación del desempeño del SBR bajo condiciones aerobias y anaerobias, 6) análisis estadístico de los resultados, 7) comparación de resultados. El factor duración del ciclo asignado en el diseño de 12 y 24 h tiende a estar incluido dentro de las frecuencias bajas de pruebas, haciéndolo distintivo. Se concluye que la tasa de remoción de la DQO en un SBR para duraciones de ciclo de 6, 12 y 24 horas usando biomasa granular bajo condiciones aerobias resultó 2 veces superior a la tasa de remoción de la biomasa suspendida. En cuanto a la biomasa granular se encontró un gradiente de remoción de DQO, bajo condición de 25% anaerobia-75% aerobia, menor del correspondiente a la remoción de DQO en la condición netamente aerobia. | en_US |
dc.description.abstract | This research deals with, the design, construction and evaluation of the operation of a sequencing batch reactor (SBR) for wastewater treatment of tanneries. The experimental phase of SBR operated with granular biomass and suspended biomass was executed in the following stages: 1) construction of SBR, 2) selection of the substrate, 3) acclimatization of the biomass, 4) experimental design, 5) evaluation of the performance of SBR under aerobic and anaerobic conditions, 6) statistical analysis, 7) comparison of results. The cycle duration factor assigned in the 12 and 24 hour design tends to be included within the low test frequencies, making it distinctive. It is concluded that the rate of removal of the COD in an SBR for cycle lengths of 6, 12 and 24 hours using granular biomass under aerobic conditions was 2 times higher than the rate of removal of the suspended biomass. In terms of granular biomass, a gradient of COD removal was found under the condition of 25% anaerobic-75% aerobic, less than the gradient of COD removal with respect to the purely aerobic condition. | en_US |
dc.language.iso | es | en_US |
dc.publisher | Universidad de Carabobo | en_US |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/3.0/ve/ | en_US |
dc.subject | reactor de carga secuencial | en_US |
dc.subject | biomasa granular | en_US |
dc.subject | biomasa suspendida | en_US |
dc.subject | sequencing batch reactor | en_US |
dc.subject | granular biomass | en_US |
dc.subject | suspended biomass | en_US |
dc.title | Diseño, construcción y evaluación del desempeño de un reactor de carga secuencial para tratamiento de aguas residuales de tenerias | en_US |
dc.title.alternative | Design, construction and evaluation of the performance of a load reactor sequential for treatment of residual waters of teneries | en_US |
dc.type | Article | en_US |